Live product · Beta
World's Best Tracker
One day you'll go looking for today.
Meds, supplements, meals, sleep, and how they actually make you feel, on one live timeline. Blueprint your day, log in seconds, and correlate what you take with how you feel.
Opens the live app in a new tab


The live dosing surface
Every dose, meal, and night of sleep on the same hours.
Taken, missed, and upcoming at a glance, with your real sunrise, sunset, and moon behind every entry. Drag an upcoming dose to move it. This is the shipping product, captured from its public demo.

The problem
Twelve apps. One body. None of them talk.
Everything a person puts in their body, and everything their body does about it, is scattered across tools that were never designed to meet. No clinician, caregiver, coach, or algorithm ever sees the whole picture, because the whole picture does not exist anywhere. Not in the EHR, which knows what was prescribed but not what was taken. Not in the pharmacy, which knows what was filled but nothing about the supplements. Not in the wearable, which knows the outcome but none of the inputs.

One record
World's Best Tracker
Medications, supplements, food, feelings, sleep, training, and cost. One consented, longitudinal record, logged by the person it belongs to, with the weather, daylight, and moon phase of each of those days attached automatically.
What it does
If you are not tracking, you are not improving.
Live dosing surface
A horizontal multi day timeline you scroll through time on. Drag an upcoming dose, meal, or sleep marker to change its time. Taken doses are pinned, effect bars show how long each thing is still working, and every entry is green for taken, red for missed, or outlined for upcoming.
Your real sky, attached automatically
Sunrise, sunset, daylight bands, moon phase, and weather for your actual location sit underneath every dose. You stop guessing whether the light, the season, or the storm front was part of the pattern.
Cabinet, cost, and inventory
Items are what you take (zinc, fish oil). Products are the exact branded thing you bought: brand, UPC, price, servings per container. Link them and the app tracks cost per gram, remaining value, consumed value, and the date each bottle runs out.
Your Day at a glance
A 24 hour grid where green is taken, orange is due now, red is missed, and outlined is later today. Tap an hour to log. It is the fastest possible input for the person who just wants to close the loop and move on.
Feelings, symptoms, correlations
Log mood, energy, sleep, reactions, and symptoms next to the inputs that might explain them. Adherence heatmaps and nutrient coverage turn months of logging into something you can actually read.
Progressive complexity
Guest first and offline capable, no account required to start. Caregiver sharing, ICS calendar export, and advanced views unlock only as your experience level rises.
Why it matters
The record nobody owns yet.

The gap is the company
The pieces exist separately. Nobody has put them in one place, under one consent, with an assistant that does the logging. That gap is the business, not any single feature in it.
Built and shipping
React and Firestore, offline first, real users logging real stacks. This is not a deck. It is a working product with a defensible data model behind it.
Open to the right partner
Investment, acquisition, or hiring me to lead your own health data vision. Bring the thesis, I bring the build.
Ready to try it?
Guest mode works offline, no account required. Bring a caregiver, export to your calendar, and see your stack in a whole new light.